Uranium FAQ > R > Recovery
Search the FAQ for entries containing:
The percentage of valuable metal in the ore that is recovered by metallurgical treatment.
Last updated on March 12, 2010 by Rich Boberg
Spot Price as of 05/21/12
Ux Consulting: $52.00(unch.)
TradeTech: $52.00 (unch.)
Long Term as of 04/30/12
Ux Consulting: $60.00
TradeTech: $61.00
The percentage of valuable metal in the ore that is recovered by metallurgical treatment.
Last updated on March 12, 2010 by Rich Boberg